/ Sectors  /  Manufacturing

Know where
the workers are.
And the tools.
And the materials.

A production line generates enormous data about machines and almost none about the movement between them. Where the work-in-progress actually sat. Which tool went missing. How long a trailer waited at the gate. That gap — inside the plant and out across the yard — is where most of the lost time lives.

Use cases

Five questions a plant
usually cannot answer.

01

WIP tracking & line efficiency

Real-time visibility of work-in-progress through the flow. Where it queued, how long each stage genuinely took, and which handover is the constraint.

02

Worker safety & zone compliance

Geofenced danger zones with proximity and dwell alerting. Evidence of who was where when an incident is investigated, rather than reconstruction from memory.

03

Tool & asset location

High-value tooling, calibrated instruments, fixtures and jigs. The search time you stop paying for tends to fund the project on its own.

04

Yard & logistics

Trailer, container and load positioning across the yard, so the gate knows what is on site and where before anyone walks out to look.

05

Quality traceability

Location-stamped process steps. When a batch is questioned, the audit trail shows where each unit physically was at every stage.

TECH

Precision where it pays

Manufacturing is where UWB often earns its cost — tight safety envelopes, robot interaction zones, fixture-level tracking — while RFID handles the chokepoints and BLE covers everything else. Usually a mix.

Proven at 5× ROI

WIP tracking at a large window manufacturer — passive RFID on every pane, UWB on the carts, locations in the existing WMS and ERP. The client's estimate: five times the system cost saved in the first year.

Read the project
Approach

Industrial buildings
are hostile to RF.

Steel structure, dense racking, moving metal, machinery noise and forklifts that reposition the environment hourly. A design that works in an office fails in a plant, which is why the discovery stage matters more here than anywhere else.

  • We model, then we validate on site. Predicted coverage is a starting point, not a deliverable — and we hold the installers to the validated design, not to the model.
  • We design for change. Racking moves. The zone model has to survive a reconfiguration without a re-survey.
  • We integrate with MES and ERP rather than adding another screen for a line supervisor to watch.
  • Pilot one cell or one line first. Prove the number before extending across the plant.

Start with one line.

A single cell or process is enough to establish whether the numbers hold in your building.